| Nuclear Power Supply Chain → Nuclear Plant Operations | Operation as the common hub The overview connects fuel, engineering, operation and the back end. | IAEA | Nuclear fuel facilities and front-/back-end classification 2026-09-29 |
| Uranium Mining and Concentrates → Uranium Refining and Conversion | Feedstock for refining and conversion Uranium feedstock requires appropriate fuel-processing services. | Cameco | Canadian conversion and CANDU fuel manufacturing 2026-09-29 |
| Uranium Refining and Conversion → Uranium Enrichment Services | Typical light-water reactor route Enrichment follows conversion; this does not apply to every reactor type. | IAEA | Nuclear fuel facilities and front-/back-end classification 2026-09-29 |
| Uranium Enrichment Services → Nuclear Fuel Assembly Manufacturing | Compatible fuel after enrichment Fuel-assembly design must match the reactor. | IAEA | Nuclear fuel facilities and front-/back-end classification 2026-09-29 |
| Uranium Refining and Conversion → Nuclear Fuel Assembly Manufacturing | Natural-uranium CANDU: no enrichment Cameco's Canadian natural-uranium CANDU fuel route can omit enrichment. | Cameco | Canadian conversion and CANDU fuel manufacturing 2026-09-29 |
| Nuclear Fuel Assembly Manufacturing → Nuclear Plant Operations | Reactor fuel supply Assemblies must match reactor and unit requirements; no vendor order is inferred. | Westinghouse | Fuel products and manufacturing facilities in the US, Sweden and UK 2026-09-29 |
| Reactor Technology and Design ↔ Nuclear Fuel Assembly Manufacturing | Reactor and fuel compatibility Fuel must match the reactor system and undergo the relevant validation. | Westinghouse | AP1000 pressurized-water reactor 2026-09-29 |
| Nuclear Materials and Large Forgings → Major Reactor Components | Vessel materials and forgings Materials are processed into components for major equipment. | Japan Steel Works | Steel forgings for nuclear pressure vessels 2026-09-29 |
| Reactor Technology and Design ↔ Nuclear Engineering and Construction | Reactor and system design Engineering integration proceeds from the reactor design. | Framatome | Design, equipment, instrumentation and control, and fuel for new nuclear plants 2026-09-29 |
| Major Reactor Components → Nuclear Engineering and Construction | Major nuclear-island equipment Equipment enters plant construction and integration. | Framatome | Design, equipment, instrumentation and control, and fuel for new nuclear plants 2026-09-29 |
| Turbines and Power Generation Equipment → Nuclear Engineering and Construction | Turbine-generator equipment The conventional and nuclear islands work together to generate power. | EDF | Arabelle Solutions nuclear steam-turbine business (2024) 2026-09-29 |
| Nuclear Instrumentation and Control → Nuclear Engineering and Construction | Instrumentation, control and protection Control and monitoring are integrated according to the plant architecture. | Doosan Enerbility | Major nuclear equipment and instrumentation and control 2026-09-29 |
| Nuclear Engineering and Construction → Nuclear Plant Operations | Plant integration and delivery Operation follows completion of engineering and related validation. | Bechtel | Nuclear engineering and construction 2026-09-29 |
| Nuclear Maintenance and Life-Extension Services → Nuclear Plant Operations | Continued-operation support Maintenance and upgrade services do not establish approval for life extension. | KHNP | Operations and maintenance services 2026-09-29 |
| Nuclear Plant Operations → Spent-Fuel Storage and Transport | Spent-fuel management Storage management already takes place during plant operation. | IAEA | Nuclear fuel facilities and front-/back-end classification 2026-09-29 |
| Spent-Fuel Storage and Transport → Fuel Reprocessing and Recycling | Optional: reprocessing route Used by some countries; not a mandatory stage. | Orano | Mining, conversion, enrichment, reprocessing and decommissioning 2026-09-29 |
| Spent-Fuel Storage and Transport → Radioactive Waste Disposal | Direct-disposal route Spent fuel proceeds to final disposal under the national program. | Posiva | Final disposal of spent fuel 2026-09-29 |
| Fuel Reprocessing and Recycling → Nuclear Fuel Assembly Manufacturing | Optional: recovered-fuel reuse Recovered material is processed into qualified fuel for compatible reactors. | Orano | Mining, conversion, enrichment, reprocessing and decommissioning 2026-09-29 |
| Fuel Reprocessing and Recycling → Radioactive Waste Disposal | Residual-waste disposal Reprocessing does not eliminate the need for final disposal. | IAEA | Nuclear fuel facilities and front-/back-end classification 2026-09-29 |
| Nuclear Plant Operations → Nuclear Decommissioning and Remediation | Engineering after retirement Decommissioning includes dismantling, decontamination and site management. | Holtec | Dismantling and decommissioning 2026-09-29 |
| Nuclear Decommissioning and Remediation → Radioactive Waste Disposal | Routes by waste category Different categories require different management and disposal approaches. | Orano | Mining, conversion, enrichment, reprocessing and decommissioning 2026-09-29 |
| Nuclear Power Supply Chain → SMR nuclear power | Explore SMRs A family of fission design and construction approaches. | IAEA | SMR and microreactor definitions 2026-10-05 |
| SMR nuclear power → MMR microreactors | Microreactor branch A smaller subset with terminology varying by institution. | IAEA | SMR and microreactor definitions 2026-10-05 |
| SMR nuclear power → Light-water SMR designs | Light-water route Representative water-cooled designs. | GE Vernova Hitachi | BWRX-300 and GNF2 fuel 2026-10-05 |
| SMR nuclear power → High-temperature gas SMRs | Gas-cooled route Xe-100 example, not an exhaustive advanced-SMR list. | X-energy | TX-1 fuel facility September 2026 milestone 2026-10-05 |
| MMR microreactors → Microreactor integration | Microreactor designs Cooling and fuel configurations differ by design. | US DOE | DOME microreactor test facility 2026-10-05 |
| Uranium Enrichment Services → Light-water SMR fuel | Conventional LEU route Darlington enrichment and fabrication contracts illustrate this route. | OPG | Cameco, Urenco, Orano and GNF fuel contracts 2026-10-05 |
| Uranium Enrichment Services ↔ HALEU feedstock | Some designs need HALEU Do not infer enrichment capability or approvals from conventional LEU. | OECD NEA | SMR challenges and opportunities 2026-10-05 |
| HALEU feedstock → TRISO fuel fabrication | Feedstock to fabrication Selected advanced designs; the two labels are not interchangeable. | X-energy | Centrus HALEU supply agreement 2026-10-05 |
| Light-water SMR fuel → Light-water SMR designs | Design-specific fuel Fuel must match the reactor and approvals. | GE Vernova Hitachi | BWRX-300 and GNF2 fuel 2026-10-05 |
| TRISO fuel fabrication → High-temperature gas SMRs | Xe-100 fuel route TRISO-X development supports Xe-100. | X-energy | TX-1 fuel facility September 2026 milestone 2026-10-05 |
| TRISO fuel fabrication → Microreactor integration | Selected microreactor fuel TRISO configurations differ across Pele, Kaleidos and eVinci. | BWXT | Full-core TRISO fuel delivery for Project Pele 2026-10-05 |
| Nuclear graphite and core materials → High-temperature gas SMRs | Nuclear graphite Disclosed SGL Carbon and Xe-100 cooperation. | X-energy | SGL Carbon graphite and Xe-100 progress 2026-10-05 |
| Nuclear graphite and core materials ↔ Microreactor integration | Graphite in selected designs eVinci uses graphite; no SGL contract is inferred. | Westinghouse | September 2026 zero-power high-temperature test 2026-10-05 |
| Nuclear Materials and Large Forgings → SMR equipment and modules | Qualified forgings NuScale and Doosan long-lead material example. | NuScale | Doosan long-lead material production order 2026-10-05 |
| Major Reactor Components ↔ SMR equipment and modules | Equipment-manufacturing overlap Check qualification and compatibility by module and design. | GE Vernova | BWXT BWRX-300 pressure-vessel contract 2026-10-05 |
| Light-water SMR designs ↔ SMR equipment and modules | Design into manufacturing BWRX-300 vessel and NuScale materials are separate projects. | GE Vernova | BWXT BWRX-300 pressure-vessel contract 2026-10-05 |
| SMR equipment and modules → SMR site engineering | Equipment to site integration Civil works and installation remain necessary. | Aecon | Darlington construction alliance with Kiewit 2026-10-05 |
| High-temperature gas SMRs ↔ SMR site engineering | Gas-reactor site works Functional link, not a claim that Darlington contractors all serve Xe-100. | IAEA | First-of-a-kind evidence and multi-module safety 2026-10-05 |
| Nuclear Instrumentation and Control ↔ SMR site engineering | Qualified control integration Project-specific verification; no universal supplier selection implied. | IAEA | First-of-a-kind evidence and multi-module safety 2026-10-05 |
| SMR site engineering → SMR grid and industrial projects | Construction and commissioning Completion, loading, grid connection and operation are distinct milestones. | OPG | Darlington construction and grid-connection target 2026-10-05 |
| Microreactor integration ↔ Microreactor heat removal | Heat and power integration Heat pipes and gas cooling are different arrangements. | Westinghouse | eVinci microreactor 2026-10-05 |
| Nuclear Instrumentation and Control ↔ Microreactor integration | Protection and control evidence Small size does not remove system verification; no contract implied. | IAEA | First-of-a-kind evidence and multi-module safety 2026-10-05 |
| Microreactor heat removal ↔ MMR demonstrations and microgrids | Full-system demonstration Integrated testing and useful power performance need verification. | US DOE | DOME microreactor test facility 2026-10-05 |
| Microreactor integration → MMR demonstrations and microgrids | Prototype and site deployment Separate experiments and approvals from commercial delivery. | US DOE | DOME microreactor test facility 2026-10-05 |
| SMR grid and industrial projects ↔ Nuclear Plant Operations | Long-term operation Future operation needs fuel, maintenance and staff; no current operation implied. | IAEA | First-of-a-kind evidence and multi-module safety 2026-10-05 |
| SMR grid and industrial projects → Spent-Fuel Storage and Transport | Plan the fuel back end Storage and disposal remain necessary for SMRs. | OECD NEA | SMR challenges and opportunities 2026-10-05 |
| MMR demonstrations and microgrids → Spent-Fuel Storage and Transport | Spent fuel and return logistics Take-back models still need qualified transport, storage and approvals. | OECD NEA | SMR challenges and opportunities 2026-10-05 |
| Nuclear Plant Operations → Electricity and Charging-Site Distribution | One source of electricity Grids can include multiple generation sources; this connection to the site's nuclear chain does not imply a direct power-purchase contract for a charging station. | US Department of Energy AFDC | EV charging equipment 2026-09-30 |
| Heavy cargo and project logistics → Major Reactor Components | Heavy nuclear equipment logistics Scope note 1 | Orano | Nuclear packaging and transport 2026-10-04 |
| Fresh fuel and uranium transport → Uranium Refining and Conversion | Material transport for conversion Scope note 1 | Orano | Nuclear packaging and transport 2026-10-04 |
| Fresh fuel and uranium transport → Uranium Enrichment Services | Material transport for enrichment Scope note 1 | Orano | Nuclear packaging and transport 2026-10-04 |
| Fresh fuel and uranium transport → Nuclear Fuel Assembly Manufacturing | Fuel manufacture and delivery logistics Scope note 1 | Orano | Fresh and spent fuel transport 2026-10-04 |
| Fresh fuel and uranium transport → Nuclear Plant Operations | Fresh fuel delivery Scope note 1 | Orano | Fresh and spent fuel transport 2026-10-04 |
| Spent fuel transport services → Spent-Fuel Storage and Transport | Approved transfers between storage locations Scope note 1 | Orano | Fresh and spent fuel transport 2026-10-04 |
| Spent fuel transport services → Fuel Reprocessing and Recycling | Transport to eligible reprocessing facilities Scope note 1 | Orano | Fresh and spent fuel transport 2026-10-04 |