| Solar PV supply chain → Solar silicon feedstock | Silicon manufacturing route Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| Solar PV supply chain → CdTe thin-film modules | CdTe thin-film route Scope note 1 | First Solar | CdTe thin-film technology 2026-10-13 |
| CdTe thin-film modules → Solar project EPC | Thin-film modules for projects Thin-film modules enter solar projects with product-specific electrical and mounting interfaces. | First Solar | CdTe thin-film technology 2026-10-13 |
| PV module manufacturing equipment → Crystalline-silicon PV modules | Module production equipment Scope note 1 | Jinchen | PV module manufacturing equipment 2026-10-13 |
| Module junction boxes and DC connections → Crystalline-silicon PV modules | Module output connections Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-13 |
| Module junction boxes and DC connections → Solar project EPC | Array DC connections Scope note 1 | Stäubli | Photovoltaic DC connectors 2026-10-13 |
| PV decommissioning and recycling → PV material separation and recovery | Separation, purification and reuse Recycling can use recovery technology; this link does not mean ITRI collects or processes every retired module. | ITRI | Recycling technology for conventional PV modules 2026-10-13 |
| CdTe thin-film modules → PV decommissioning and recycling | Thin-film module recycling Scope note 1 | First Solar | Module recycling services 2026-10-13 |
| Solar silicon feedstock → Solar ingots and wafers | Feedstock to ingots and wafers Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| Solar ingots and wafers → Photovoltaic cells | Cell substrate material Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| PV conductive pastes → Photovoltaic cells | Collection electrodes Scope note 1 | Giga Solar | PV conductive pastes 2026-10-07 |
| Photovoltaic cells → Crystalline-silicon PV modules | Generating devices Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| Encapsulation-grade EVA resin → Encapsulation films and backsheets | Encapsulation film feedstock Scope note 1 | USI | Solar encapsulation-grade EVA resin 2026-10-07 |
| Encapsulation films and backsheets → Crystalline-silicon PV modules | Encapsulation and rear protection Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| Solar PV glass → Crystalline-silicon PV modules | Module glass Scope note 1 | Xinyi Solar | Photovoltaic glass 2026-10-07 |
| Cell interconnect ribbons → Crystalline-silicon PV modules | Cell interconnection Scope note 1 | Gigastorage | PV interconnect ribbons 2026-10-07 |
| Films, fibers and sheets ↔ Encapsulation films and backsheets | Polymer film application Scope note 1 | USI | Solar encapsulation-grade EVA resin 2026-10-07 |
| Crystalline-silicon PV modules → Solar project EPC | Equipment for site integration Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| Mounting and site structures → Solar project EPC | Equipment for site integration Scope note 1 | US DOE | PV manufacturing and system equipment 2026-10-07 |
| PV inverters → Solar project EPC | Equipment for site integration Scope note 1 | Delta | PV inverters 2026-10-07 |
| Substation equipment → Solar project EPC | Equipment for site integration Scope note 1 | Fortune Electric | Solar distribution transformers 2026-10-07 |
| Solar PV supply chain → PV development and plant investment | Development and asset ownership Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| PV development and plant investment → Solar project EPC | Project engineering engagement Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Solar project EPC → PV operations and maintenance | Handover to operations Scope note 1 | TSEC | Cells, modules and system services 2026-10-07 |
| PV development and plant investment → PV operations and maintenance | Asset and maintenance arrangements Scope note 1 | J&V Energy | Plant development and operations 2026-10-07 |
| PV operations and maintenance → Power grids and dispatch | Grid-connected electricity output Physical output for grid-connected projects; self-consumption is another arrangement. | US DOE | PV manufacturing and system equipment 2026-10-07 |
| PV operations and maintenance → Electricity users | Self-consumption option Self-consumption and wiring are project-specific, not a universal route. | Delta | Renewable energy and storage integration 2026-10-07 |
| PV development and plant investment → Green electricity services | Generation-side sales arrangements Scope note 1 | HDRE | Storage and green electricity services 2026-10-07 |
| Green electricity services → Electricity users | Green-power demand matching Scope note 1 | HDRE | Storage and green electricity services 2026-10-07 |
| Solar-plus-storage ↔ PV operations and maintenance | Optional storage integration Not mandatory for every plant; compatible conversion and control are required. | Delta | Renewable energy and storage integration 2026-10-07 |
| PV operations and maintenance → PV decommissioning and recycling | Replacement and retirement Scope note 1 | Taiwan MOENV | End-of-life PV module management 2026-10-07 |
| Solar PV supply chain → Rooftop PV | Installation application Scope note 1 | J&V Energy | Rooftop, ground and water-site projects 2026-10-07 |
| Solar project EPC → Rooftop PV | Site-specific engineering Scope note 1 | J&V Energy | Rooftop, ground and water-site projects 2026-10-07 |
| Rooftop PV → PV operations and maintenance | Generation and maintenance Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Solar PV supply chain → Ground-mounted PV | Installation application Scope note 1 | J&V Energy | Rooftop, ground and water-site projects 2026-10-07 |
| Solar project EPC → Ground-mounted PV | Site-specific engineering Scope note 1 | J&V Energy | Rooftop, ground and water-site projects 2026-10-07 |
| Ground-mounted PV → PV operations and maintenance | Generation and maintenance Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Solar PV supply chain → Water-site and floating PV | Installation application Scope note 1 | J&V Energy | Rooftop, ground and water-site projects 2026-10-07 |
| Solar project EPC → Water-site and floating PV | Site-specific engineering Scope note 1 | J&V Energy | Rooftop, ground and water-site projects 2026-10-07 |
| Water-site and floating PV → PV operations and maintenance | Generation and maintenance Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Solar PV supply chain → Aquaculture-integrated PV | Installation application Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Solar project EPC → Aquaculture-integrated PV | Site-specific engineering Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Aquaculture-integrated PV → PV operations and maintenance | Generation and maintenance Scope note 1 | HDRE | Plants, EPC and operations services 2026-10-07 |
| Substation equipment ↔ PV inverters | AC-side equipment integration Inverters convert DC to AC while transformers change voltage; wiring varies by plant. | Fortune Electric | Solar distribution transformers 2026-10-07 |