| Wind farm operations → Power grids and dispatch | Electricity delivered to the grid | DOE | Wind turbine components and grid connection 2026-10-01 |
| Substation equipment → Wind farm operations | Substation and protection equipment | TECO | Zhong Neng onshore substation EPC 2026-10-01 |
| Thermal power supply chain → Coal plant operations | Coal generation branch | MHI | Power generation boilers 2026-10-01 |
| Thermal power supply chain → Gas combined-cycle operations | Gas combined-cycle branch | GE Vernova | Gas power and combined-cycle configurations 2026-10-01 |
| Thermal coal supply → Coal logistics and handling | Thermal coal delivery | Glencore | Thermal coal production and marketing 2026-10-01 |
| Coal logistics and handling → Coal plant operations | Operating fuel supply | Glencore | Thermal coal production and marketing 2026-10-01 |
| Coal boilers and steam systems → Coal plant operations | Boiler equipment | MHI | Power generation boilers 2026-10-01 |
| Coal boilers and steam systems ↔ Steam turbine generation | Coal-fired steam cycle | MHI | Power generation boilers 2026-10-01 |
| Steam turbine generation → Coal plant operations | Steam generation equipment | Doosan Enerbility | Thermal plant equipment 2026-10-01 |
| Gas production and gathering → LNG liquefaction and export | Feed gas to liquefaction | Cheniere | LNG liquefaction, shipping and regasification 2026-10-01 |
| LNG liquefaction and export → LNG shipping | LNG export loading | Cheniere | LNG liquefaction, shipping and regasification 2026-10-01 |
| LNG shipping → LNG terminals and regasification | LNG delivery to terminal | MOL | LNG shipping and vessel management 2026-10-01 |
| LNG terminals and regasification → Gas combined-cycle operations | Regasified fuel supply | CPC Taiwan | 2025 natural-gas supply overview 2026-10-01 |
| Gas production and gathering → Gas combined-cycle operations | Alternative: direct pipeline gas Pipeline-connected markets can omit liquefaction, shipping and regasification. | Cheniere | LNG liquefaction, shipping and regasification 2026-10-01 |
| Gas turbines and generators → Gas combined-cycle operations | Gas-turbine generation equipment | GE Vernova | Gas power and combined-cycle configurations 2026-10-01 |
| Gas turbines and generators ↔ Heat recovery steam generators | Combined cycle: exhaust heat recovery | GE Vernova | Gas power and combined-cycle configurations 2026-10-01 |
| Heat recovery steam generators ↔ Steam turbine generation | Combined cycle: steam bottoming cycle | GE Vernova | Gas power and combined-cycle configurations 2026-10-01 |
| Heat recovery steam generators → Gas combined-cycle operations | HRSG equipment | GE Vernova | Gas power and combined-cycle configurations 2026-10-01 |
| Steam turbine generation → Gas combined-cycle operations | Steam-cycle generation equipment | GE Vernova | Gas power and combined-cycle configurations 2026-10-01 |
| Thermal plant EPC → Coal plant operations | Plant construction and commissioning | CTCI | Linkou coal plant EPC reference 2026-10-01 |
| Cooling, auxiliaries and controls → Coal plant operations | Cooling, auxiliaries and controls | Doosan Enerbility | Thermal plant equipment 2026-10-01 |
| Emissions and water treatment → Coal plant operations | Plant-specific pollution controls | Mitsubishi Power | Air quality control systems 2026-10-01 |
| Thermal plant maintenance → Coal plant operations | Maintenance and equipment renewal | Doosan Enerbility | Thermal plant equipment 2026-10-01 |
| Substation equipment → Coal plant operations | Substation and grid equipment | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| Coal plant operations → Power grids and dispatch | Electricity output | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| Thermal plant EPC → Gas combined-cycle operations | Plant construction and commissioning | CTCI | 2025 Tung Hsiao phase 2 combined-cycle contract 2026-10-01 |
| Cooling, auxiliaries and controls → Gas combined-cycle operations | Cooling, auxiliaries and controls | Doosan Enerbility | Thermal plant equipment 2026-10-01 |
| Emissions and water treatment → Gas combined-cycle operations | Plant-specific pollution controls | Mitsubishi Power | Air quality control systems 2026-10-01 |
| Thermal plant maintenance → Gas combined-cycle operations | Maintenance and equipment renewal | Siemens Energy | Mai-Liao equipment and long-term services 2026-10-01 |
| Substation equipment → Gas combined-cycle operations | Substation and grid equipment | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| Gas combined-cycle operations → Power grids and dispatch | Electricity output | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| Coal plant operations → Coal ash and gypsum management | Coal ash and applicable FGD byproducts | Taipower | Coal ash and desulfurization gypsum reuse 2026-10-01 |
| Emissions and water treatment ↔ Coal ash and gypsum management | Treatment design determines byproducts | Doosan Enerbility | Thermal plant equipment 2026-10-01 |
| Substation equipment → Power grids and dispatch | Grid equipment and engineering | Hitachi Energy | Grid integration and substation equipment 2026-10-01 |
| Power grids and dispatch → Electricity users | Transmission and distribution to users | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| Power grids and dispatch → Data Center Power | Electricity for data centers | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| Power grids and dispatch → Electricity and Charging-Site Distribution | Electricity for EV charging | EIA | Electricity transmission and delivery to consumers 2026-10-01 |
| LNG and LPG transport → LNG shipping | LNG branch Scope note 1 | MOL | LNG carrier operations 2026-10-04 |
| Dry bulk shipping → Coal logistics and handling | Dry bulk carriage for coal imports Scope note 2 | U-Ming | Bulk commodity shipping 2026-10-04 |
| Dry bulk terminals and storage → Coal logistics and handling | Coal unloading and stockyard interface Scope note 2 | HES Maasdelta | Dry bulk handling and storage 2026-10-04 |
| Gas production and gathering → NGL and LPG feedstocks | Recover light hydrocarbons from gas processing Scope note 3 | EIA | Ethane, propane and petrochemical uses 2026-10-04 |
| Gas production and gathering → Methanol and formaldehyde | Natural gas to syngas and methanol Scope note 3 | MGC | From methanol to POM 2026-10-04 |
| Filled-epoxy electrical castings → Substation equipment | Suitable insulating castings for electrical equipment Scope note 4 | Huntsman | Anhydride cure and electrical casting 2026-10-05 |
| Substation equipment → Solar project EPC | Equipment for site integration Scope note 5 | Fortune Electric | Solar distribution transformers 2026-10-07 |
| PV operations and maintenance → Power grids and dispatch | Grid-connected electricity output Physical output for grid-connected projects; self-consumption is another arrangement. | US DOE | PV manufacturing and system equipment 2026-10-07 |
| PV operations and maintenance → Electricity users | Self-consumption option Self-consumption and wiring are project-specific, not a universal route. | Delta | Renewable energy and storage integration 2026-10-07 |
| Green electricity services → Electricity users | Green-power demand matching Scope note 5 | HDRE | Storage and green electricity services 2026-10-07 |
| Substation equipment ↔ PV inverters | AC-side equipment integration Inverters convert DC to AC while transformers change voltage; wiring varies by plant. | Fortune Electric | Solar distribution transformers 2026-10-07 |